Plugging and Abandonment (P&A)
- Length
- Set by each provider
- Level
- Intermediate
- Language
- English
- Modules
- 7
- Max students
- 20
- Rating
- Not rated yet
- Be the first to review
What it usually covers
- 1
Why Wells Are Plugged and Abandoned
- What Plugging and Abandonment Means
- Why Wells Reach the End of Their Life
- Permanent Abandonment, Temporary Abandonment and Suspension
- Regulations and Standards for Well Decommissioning
- Roles and Responsibilities in a P&A Project
- 2
The Well Barrier Philosophy
- Well Barriers and Well Barrier Elements
- Primary, Secondary and Open Hole to Surface Barriers
- Requirements for a Permanent Barrier Material
- Placing a Barrier: Full Cross-Section and Formation Strength
- Identifying Sources of Inflow and Cross-Flow
- 3
Well Status Review and Planning
- Gathering the Well History
- Evaluating Cement Behind Casing
- Annulus Pressures and Sustained Casing Pressure
- Assessing Access and Well Condition
- Building the Abandonment Programme
- 4
P&A Phases, Barrier Materials and Cement Placement
- The Three Phases of P&A
- Cement as a Permanent Barrier Material
- Alternative Barrier Materials
- Placing Balanced Cement Plugs
- Cement Retainers and Squeeze Cementing
- 5
Reaching the Annulus and Verifying Barriers
- Casing Cutting and Pulling
- Section Milling
- Perforate, Wash and Cement
- Tagging and Pressure Testing Barriers
- Logging Behind Casing and Barrier Acceptance
- 6
Executing P&A Work Safely and Efficiently
- Rig-Based, Rigless and Vessel-Based P&A
- Coiled Tubing and Wireline in P&A
- Wellhead Removal and Seabed Clearance
- Health, Safety and Environmental Considerations
- Cost Drivers and Campaign Planning
- 7
Closing Out and Applying P&A Judgement
- Records and Handover to the Authorities
- Long-Term Liability for Abandoned Wells
- Case Study: Abandoning an Old Platform Well
- Case Study: Problems Found During Execution
- The Complete P&A Picture
This page describes what the training usually covers. Each training provider may change the content, the length and the order to suit the group. Confirm the final content with the training provider before you book.
Skills you will build
Finishing it counts toward these skills, at the level shown.
Prefer to learn at your own pace?
The same subject as an online course you can start today.

Plugging and Abandonment (P&A)
7 h 28 min
More in Oil & Gas
Other courses with a trainer in the same subject area.
Reviews
What learners say about Plugging and Abandonment (P&A).
No reviews yet
Be the first to say what Plugging and Abandonment (P&A) was like.
Sign in to write one. We check every review before it is shown.
Book Now
Is it what you were looking for?
Contact our team to check the course and seat availability in your preferred location
Book Now
