Volumetric Stripping
- Durée
- Fixée par chaque organisme
- Niveau
- Débutant
- Langue
- English
- Modules
- 21
- Participants max.
- 20
- Note
- Pas encore noté
- Donnez le premier avis
À propos de cette formation
Volumetric stripping involves moving pipe through a closed well-control system while managing pressure and volume. Careful planning and monitoring help maintain well control during the operation. Learners will study the key principles, calculations, equipment, and steps used in volumetric stripping. They will be better prepared to review an operation and identify when conditions require a response.
À qui s'adresse ce cours
This training is intended for drilling and well-service personnel involved in well control or pipe movement under pressure. It may also suit supervisors and engineers who plan or review these operations.
Ce que vous allez apprendre
- Explain the principles of volumetric stripping.
- Identify the equipment used during volumetric stripping operations.
- Apply pressure and volume calculations to operational scenarios.
- Describe the steps for planning and conducting a stripping operation.
- Monitor pressure, volume, and well conditions during the operation.
- Recognise conditions that may require pausing or changing the operation.
Avant de commencer
A basic understanding of drilling operations and well control is recommended.
Ce qu'elle couvre habituellement
- 1
Well Control Foundations
- Well pressure and pressure balance
- Well-control principles
- Purpose of volumetric stripping
- 2
Equipment and System Setup
- Well-control equipment
- Pipe movement through a closed system
- Pressure monitoring points
- 3
Pressure and Volume Principles
- Pressure changes during pipe movement
- Volume displacement
- Managing pressure as conditions change
- 4
Operational Calculations
- Required operational data
- Pressure and volume calculations
- Checking calculation inputs
- 5
Planning the Operation
- Reviewing well conditions
- Defining operational steps and responsibilities
- Preparing for changing conditions
- 6
Conducting and Monitoring
- Following the planned sequence
- Monitoring pressure and volume
- Recording operational changes
- 7
Contingencies and Review
- Recognising unexpected pressure or volume changes
- Pausing and reassessing the operation
- Reviewing results and operational records
Cette page décrit ce que la formation couvre habituellement. Chaque prestataire de formation peut modifier le contenu, la durée et l'ordre pour s'adapter au groupe. Confirmez le contenu final avec le prestataire de formation avant de réserver.
Organismes de formation qui la dispensent
- Maersk TrainingSvendborg, DenmarkDemander un devis
Autres cours : Pétrole et gaz
Autres cours avec un formateur dans le même domaine.
Avis
Ce que les apprenants disent de Volumetric Stripping.
Pas encore d'avis
Soyez la première personne à dire ce que vous avez pensé de Volumetric Stripping.
Connectez-vous pour en rédiger un. Nous vérifions chaque avis avant de l'afficher.
Réserver
Est-ce ce que vous cherchiez ?
Contactez notre équipe pour vérifier la disponibilité du cours et des places dans le lieu de votre choix
Réserver

