Well Completion and Workover
- Durée
- Fixée par chaque organisme
- Niveau
- Expert
- Langue
- English
- Modules
- 8
- Participants max.
- 20
- Note
- Pas encore noté
- Donnez le premier avis
Ce qu'elle couvre habituellement
- 1
Completion Engineering Foundations
- The Completion Life Cycle and Basis of Design
- Nodal Analysis for Completion Design
- Tubing Stress Analysis and Movement
- Materials Selection for Corrosive Wells
- Completion and Workover Fluids
- 2
Completion Design
- Completion Types
- Completion Equipment
- Designing Completions for Artificial Lift
- Horizontal and Multilateral Completion Architecture
- Intelligent Completions: Design and Failure Modes
- 3
Connecting to the Reservoir
- Perforating and Stimulation
- Sand Control
- Perforating Design: Charges, Conveyance and Shock Loads
- Hydraulic Fracture Design and Execution Judgement
- Selecting Sand Control: Comparing the Options
- 4
Installing the Completion
- Writing the Completion Programme
- Wellbore Cleanout and Displacement
- Running, Setting and Testing the Completion
- Barrier Verification During Completion Operations
- Well Start-Up, Clean-Up and Initial Testing
- 5
Intervention and Integrity
- Well Intervention and Workover
- Well Integrity
- Coiled Tubing Job Design: Forces, Lock-Up and Fatigue
- Pressure Control Equipment for Live-Well Intervention
- Diagnosing Sustained Casing Pressure
- 6
Diagnosing and Restoring Production
- Diagnosing Underperforming Wells
- Downhole Scale, Wax and Asphaltene Remediation
- Water and Gas Shut-Off Techniques
- Fishing and Milling Operations
- Recompletion, Sidetrack or Abandon
- Intervention Candidate Selection and Economics
- 7
Well Integrity Management and Abandonment
- Integrity Categories and Operating With Impaired Barriers
- Safety Valve and Tree Valve Testing
- Assessing Corrosion and Casing Wear With Logs
- Designing Permanent Plug and Abandonment
- Abandonment Execution and Verification
- 8
Applying Judgement: Completion and Workover Cases
- Case Study: Workover of a Well With a Tubing Leak
- Case Study: Selecting a Completion for a Subsea Development
- Case Study: A Stimulation That Damaged the Well
- Case Study: Converting a Producer to Water Injection
- Case Study: High-Pressure, High-Temperature Completion
- Defending Completion and Intervention Decisions
Cette page décrit ce que la formation couvre habituellement. Chaque prestataire de formation peut modifier le contenu, la durée et l'ordre pour s'adapter au groupe. Confirmez le contenu final avec le prestataire de formation avant de réserver.
Compétences que vous développerez
Le terminer compte pour ces compétences, au niveau indiqué.
Vous préférez apprendre à votre rythme ?
Le même sujet en cours en ligne, à commencer dès aujourd'hui.

Complétion et reconditionnement de puits
9 h 22 min
Autres cours : Pétrole et gaz
Autres cours avec un formateur dans le même domaine.
Avis
Ce que les apprenants disent de Well Completion and Workover.
Pas encore d'avis
Soyez la première personne à dire ce que vous avez pensé de Well Completion and Workover.
Connectez-vous pour en rédiger un. Nous vérifions chaque avis avant de l'afficher.
Réserver
Est-ce ce que vous cherchiez ?
Contactez notre équipe pour vérifier la disponibilité du cours et des places dans le lieu de votre choix
Réserver
