Checked the prime mover simulation on its new page. The walk-round and the parts list worked well in the browser.
3D Exploration Simulation | 6×4 Prime Mover (Tractor Unit)
Explore a 6x4 prime mover (tractor unit) in 3D in the yard. It is built to ISO 7638-1 (ABS/EBS electrical connector, 24 V), ISO 12098 (15-pole lighting connector, 24 V), and ISO 1185 (7-pole 24N connector). Open every part and find the fifth wheel's locking jaws, the release handle and safety lock, red and yellow air lines, the ABS or EBS cable and socket, a spring brake chamber and the air tanks that feed it, blind-spot mirrors, cab steps, grab handles, and wheel chocks. Press Finish exploring when you are done.
- Tasks
- 10 tasks
- Languages
- English
- Saved
- Inside a course
Play it here
The simulations are for familiarization and practice. They do not replace hands-on training and a practical evaluation by a competent person.
What you will do
- 1Open every part of the prime mover
- 2Find the fifth wheel's locking jaws
- 3Find the release handle and the safety lock that holds it in
- 4Find the red and the yellow air lines
- 5Find the ABS or EBS cable and the socket it plugs into
- 6Find a spring brake chamber and the air tanks that feed it
- 7Find the blind-spot mirrors
- 8Find the cab steps and the grab handles
- 9Find the wheel chocks
- 10Press Finish exploring when you are done
10 tasks
Built to
- ISO 7638-1 (ABS/EBS electrical connector, 24 V)
Aligned with these documents; not approved by the bodies that wrote them.
Reviews
What learners say about 3D Exploration Simulation | 6×4 Prime Mover (Tractor Unit).
Based on 1 review
- 5 stars
- 4 stars
- 3 stars
- 2 stars
- 1 star
Sign in and finish one run first. We check every review before it is shown.
More simulations
All simulations
Well kill assessmentDrillingAssessment. Shut in a kick, fill in the kill sheet and circulate kill mud until the well is dead.5 tasks · Pass mark 80%
Rear-wheel steering simulation | ForkliftMaterials handlingDrive the LX-25 electric counterbalance forklift (2.5 t) through the cone lane and into the green finish circle.1 task · Pass mark 70%
Fork height, tilt and travelMaterials handlingPick up a pallet and carry it to Bay B with the forks low and the mast tilted back.1 task · Pass mark 70%
For teams
Your site, your equipment, your procedures
The demos use the same engines we build for customers. Tell us the task and we build it; you review each stage.