iCompetent Logo

Excavation & Ground Disturbance

How to plan, permit and control excavation and ground-disturbance work so nobody is buried by a collapse or injured by striking a buried service. For anyone who digs, supervises digging, or authorises ground disturbance on an oil and gas site.

The four levels

Each level builds on the one before it.

  1. 1Awareness
  2. 2Knowledge
  3. 3Skill
  4. 4Mastery

Skill and Mastery are proved at work, not by a course: an assessor at your organisation signs you off on corp.icompetent.com.

What you'll learn

  • Explain why excavation collapse and buried-service strikes are the two dominant killers in ground-disturbance work
  • Apply the service-location sequence: records, locating and scanning, then hand-digging or vacuum excavation within the tolerance zone of a service
  • Select an appropriate protective system (sloping or benching, shoring, or a trench box) for the soil type, depth and water conditions
  • Set out an excavation correctly: spoil and equipment set-back from the edge, ladder access within reach, barricading and edge protection
  • Recognise when an excavation must be treated as a confined space and gas tested before entry
  • Carry out and act on competent-person inspections daily, after rain, and after any change in conditions

How to earn this skill

Any one way below proves the level. Every step in a way is needed.

Knowledge

Ready to build Excavation & Ground Disturbance?

Take a course that builds this skill. When you finish it, the level shows on your profile.