Operating Discipline & Shift Handover

How to hand over a shift so nothing is lost between crews — the written and verbal handover, plant status and abnormal line-ups, live permits, overrides and inhibits, log-keeping discipline and the fatigue that makes shift change the weakest moment of the day. For operators, technicians, supervisors and anyone who takes or gives control of running plant.

The four levels

Each level builds on the one before it.

  1. 1Awareness
  2. 2Knowledge
  3. 3Skill
  4. 4Mastery

Skill and Mastery are proved at work, not by a course: an assessor at your organisation signs you off on corp.icompetent.com.

What you'll learn

  • Explain why incomplete shift handover is a recurring contributor to major process incidents.
  • Describe the principles of an effective handover: written plus verbal, face to face, two-way questioning, protected overlap time.
  • Apply a structured handover checklist covering plant status, abnormal line-ups, live permits, overrides and inhibits, ongoing jobs and standing instructions.
  • Keep contemporaneous, factual operating logs and maintain an accurate override and inhibit register.
  • Recognise how fatigue and time pressure at shift change degrade communication, and apply countermeasures.
  • Assess and improve handover quality across a team, treating operating discipline as a leadership responsibility.

How to earn this skill

Any one way below proves the level. Every step in a way is needed.

Ready to build Operating Discipline & Shift Handover?

Take a course that builds this skill. When you finish it, the level shows on your profile.